Scientific journal
Scientific Review. Technical science
ISSN 2500-0799
ПИ №ФС77-57440

COMPARATIVE ANALYSIS OF THE SUBCONTRACTING SCHEDULING METHODS

Antonova A.S. 1 Aksyonov K.A. 1
1 Ural Federal University n.a. the first president of Russia B.N. Yeltsin
The article presents a comparative analysis of the following scheduling methods: methods of the network scheduling (critical path method, PERT and GERT methods), method of cooperation of the demands-opportunities network agents developed by Kleymenova E.M. and Skobelev P.O., method of the simulation and genetic algorithms integration developed by Kureichik V.V., and multiagent genetic optimization method developed by article authors on the basis of the Kureichik V.V. method. As a result of the analysis the advantage of the multiagent genetic optimisation method was revealed in terms of subcontracting scheduling. The multiagent genetic optimisation method takes into account the non-renewable resources and allows to implement different resource allocation strategies using simulation and multiagent modeling, allows to optimize subcontract resources via analysis of alternative work schedules using genetic algorithms and simulation, reschedules the works using numerical methods of uncertainty removing and simulation.